EEMC workshop includes: 220, 500kV assembly workshop; Assembly workshop 110kV MBA; MBAPP assembly workshop, wire wrapping workshop; Magnetic Processing Factory; Service workshop; Mechanical workshop.
TT | Name of factory | Acreage
m2 |
Crane load |
1 |
Assembly workshop 220, 500kV | 3.300 | 1 x 320T (2 x 160T)1 x 150T |
2 | Assembly workshop 110kV MBA | 3.200 | 1 x 50T |
3 | Main workshop (5 times), including: MBAPP assembly workshop, wire wrapping workshop, magnetic machining workshop, service workshop. |
10.800 |
Gian 1: 10T, 3T, 5T
Gian 2: 80T Gian 3: 5T Gian 4: 10T, 3T Gian 5: 25T, 5T |
4 | Mechanical workshop (3 times) | 4.300 | Gian CK: 5T, 5T, 3T
Gian KCT: 25T, 10T, 5T |
5 | Secondary workshop (2 times) | 3.900 | 10T, 5T, 3T |
Assembly plant transformer transmission up to 500kV
Assembly of distribution transformers
Transformer workshop
Experimental super-high pressure station> 500kV
Mechanical workshop
Machining workshop horizontal axis