{"id":15884,"date":"2025-02-24T15:27:51","date_gmt":"2025-02-24T08:27:51","guid":{"rendered":"https:\/\/eemc.com.vn\/14346.html"},"modified":"2025-03-24T09:15:49","modified_gmt":"2025-03-24T02:15:49","slug":"14346","status":"publish","type":"post","link":"https:\/\/eemc.com.vn\/en\/14346.html","title":{"rendered":"Factory Release and Signboard Ceremony for the &#8220;Design and Manufacture of 500 kV &#8211; 3\u00d7300 MVA Transformers&#8221; Project."},"content":{"rendered":"<p>On December 16, 2024, Dong Anh Electrical Equipment Corporation (EEMC) successfully held the Factory Dispatch Ceremony and Installed the Project Signboard \u201cDesign and Manufacturing of 500 kV \u2013 3\u00d7300 MVA Transformers\u201d to celebrate the 70th anniversary of the Vietnamese Electricity Industry Tradition Day (December 21, 1954 \u2013 December 21, 2024).<\/p>\n<figure id=\"attachment_14347\" aria-describedby=\"caption-attachment-14347\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg\"><img decoding=\"async\" class=\"wp-image-14347 size-medium\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1-600x400.jpg\" alt=\"\" width=\"600\" height=\"400\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1-600x400.jpg 600w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1-1200x800.jpg 1200w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1-768x512.jpg 768w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1-1536x1024.jpg 1536w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1-2048x1366.jpg 2048w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-14347\" class=\"wp-caption-text\">Leaders performed the ribbon-cutting ceremony to dispatch the 500 kV \u2013 3\u00d7300 MVA transformer.<\/figcaption><\/figure>\n<p>Attending the ceremony were Mr. Truong Thanh Hoai, Deputy Minister of Industry and Trade, along with representatives from various departments, agencies, and institutes under the Ministry of Industry and Trade, the Ministry of Science and Technology, and the Ministry of Public Security. Representing the Vietnam Electricity Group were Mr. Dang Hoang An, Secretary of the Party Committee and Chairman of the Board of Members; Mr. Nguyen Anh Tuan, Deputy Party Committee Secretary and General Director; the leadership of the National Power Transmission Corporation, the National Electricity System and Market Operation Company; the Party Secretary of the Hanoi Enterprise Cluster, Chairman of the Vietnamese Mechanical Enterprises Association, representatives of Dong Anh town authorities; and numerous outstanding officers and workers of EEMC, along with media representatives.<\/p>\n<p>In his project report, Mr. Nguyen Vu Cuong \u2013 General Director of EEMC \u2013 emphasized: With the aim of mastering the design and manufacturing technology of the 500 kV \u2013 3\u00d7300 MVA transformer series, which is the largest capacity transformer in the Vietnamese power transmission network currently being imported, EEMC proposed and received approval from the Ministry of Science and Technology to implement the national-level trial production project \u201cCompleting the Design and Manufacturing Technology of the 500 kV \u2013 3\u00d7300 MVA Transformer Unit.\u201d<\/p>\n<figure id=\"attachment_14349\" aria-describedby=\"caption-attachment-14349\" style=\"width: 653px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture2.png\"><img decoding=\"async\" class=\"wp-image-14349 size-full\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture2.png\" alt=\"\" width=\"653\" height=\"367\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture2.png 653w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture2-600x337.png 600w\" sizes=\"(max-width: 653px) 100vw, 653px\" \/><\/a><figcaption id=\"caption-attachment-14349\" class=\"wp-caption-text\">Mr. Nguyen Vu Cuong \u2013 General Director of EEMC reported on the project&#8217;s progress.<\/figcaption><\/figure>\n<p>With the support of the Ministry of Science and Technology, and through determination and the prioritization of resources, EEMC has implemented many investment projects, such as constructing a 4,000 kV ultra-high voltage laboratory, expanding its factory, and investing in numerous state-of-the-art technological devices\u2014some of which are being applied in Vietnam for the first time.<\/p>\n<p class=\"\" data-start=\"2248\" data-end=\"2608\">Since September 2024, EEMC officially began manufacturing the transformer casing, magnetic circuit, and winding sets. The dedicated team of engineers and skilled workers at EEMC worked intensively, overcoming many challenges to complete the dispatch of the 500 kV \u2013 3\u00d7300 MVA transformer in early December 2024, with all parameters meeting IEC 60076 standards.<\/p>\n<p class=\"\" data-start=\"2610\" data-end=\"3459\">Over its more than 50 years of development, EEMC has consistently affirmed its pioneering position in the electrical mechanical industry, having supplied over 1,130 power transformers ranging from 110 kV to 500 kV to the market. From the first 110 kV transformer produced in 1993, the 220 kV transformer in 2003, to the 500 kV \u2013 3\u00d7150 MVA transformer unit in 2010, and now the 500 kV \u2013 3\u00d7300 MVA series\u2014the largest transformer series in Vietnam\u2019s power transmission system\u2014EEMC\u2019s successful research and manufacturing of the 500 kV \u2013 3\u00d7300 MVA transformer unit confirms the correct policies of the Government, ministries, and the Vietnam Electricity Group in developing key domestic electrical mechanical products, gradually increasing the localization rate, and contributing to ensuring energy security for the country\u2019s socio-economic development.<\/p>\n<p>In his congratulatory speech, Deputy Minister Truong Thanh Hoai acknowledged and highly praised EEMC\u2019s efforts and innovative spirit in focusing on the research, manufacturing, and production of the largest 500 kV transformer for the transmission system. This achievement also demonstrates the innovative spirit and the capability to master science and technology in producing electrical equipment with a distinctive Vietnamese mark.<\/p>\n<figure id=\"attachment_14351\" aria-describedby=\"caption-attachment-14351\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture3.png\"><img decoding=\"async\" class=\"wp-image-14351 size-medium\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture3-600x400.png\" alt=\"\" width=\"600\" height=\"400\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture3-600x400.png 600w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture3.png 624w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-14351\" class=\"wp-caption-text\">Deputy Minister Truong Thanh Hoai congratulated and encouraged EEMC.<\/figcaption><\/figure>\n<p>According to Deputy Minister Truong Thanh Hoai, with the new National Assembly having recently passed the Electricity Law\u2014which mandates that certain items and equipment must be produced domestically\u2014a large market capacity has opened up, along with challenges for electrical mechanical enterprises. Based on this law, the Ministry of Industry and Trade will submit a decree to the Government to meet the target of domestic production for these items and equipment, coupled with support in terms of capital and investment resources. In particular, with the upcoming huge demand for new power sources such as offshore wind power, which is closely linked to national security, it is expected that all equipment will be domestically produced.<\/p>\n<p class=\"\" data-start=\"4637\" data-end=\"4884\">Therefore, the Deputy Minister expressed his hope that EEMC will build on its achievements, seize opportunities, and strive further to contribute to the sustainable development of Vietnam\u2019s electricity industry and ensure national energy security.<\/p>\n<p class=\"\" data-start=\"4886\" data-end=\"5315\">At the ceremony, Mr. Dang Hoang An \u2013 Chairman of the Board of Members of the Vietnam Electricity Group \u2013 highly appreciated and congratulated the efforts of the EEMC staff for achieving the remarkable product of the 500 kV \u2013 3\u00d7300 MVA transformer. He emphasized that this success once again affirms the tradition of creative labor among EEMC\u2019s employees, who continuously research and develop new products to meet market demands.<\/p>\n<p class=\"\" data-start=\"5317\" data-end=\"5909\">He stated that, with over 80% of the 220 kV transformers and 50% of the 110 kV transformers in Vietnam\u2019s power grid being EEMC products, the corporation has helped the Electricity Industry take a proactive role in investment and construction, ensuring electricity supply for socio-economic development. Currently, EEMC is the leading entity in the development of Vietnam\u2019s electrical mechanical industry. Notably, aside from supplying equipment and developing the domestic market, in 2024 EEMC also secured its first export contract for a 132 kV &#8211; 70 MVA transformer to the Australian market.<\/p>\n<figure id=\"attachment_14353\" aria-describedby=\"caption-attachment-14353\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture4.jpg\"><img decoding=\"async\" class=\"wp-image-14353\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture4.jpg\" alt=\"\" width=\"600\" height=\"399\" \/><\/a><figcaption id=\"caption-attachment-14353\" class=\"wp-caption-text\">Mr. Dang Hoang An \u2013 Chairman of the Board of Members of EVN delivered a speech at the ceremony.<\/figcaption><\/figure>\n<p class=\"\" data-start=\"5911\" data-end=\"6224\">However, with the spirit of \u201celectricity always moving ahead,\u201d the EVN Chairman urged EEMC not to be content with today\u2019s results, but to quickly expand its product portfolio\u2014not limiting itself to traditional products\u2014and shorten the cycle for developing new products to meet the enormous domestic market demand.<\/p>\n<p class=\"\" data-start=\"6226\" data-end=\"6425\">At the same time, he emphasized the need to boost marketing efforts and export to international markets on the principle that the products must meet international standards and be highly competitive.<\/p>\n<p class=\"\" data-start=\"6427\" data-end=\"6739\">He also suggested that EEMC expand its cooperation with capable partners both domestically and internationally, allocate resources to invest in and upgrade its technological lines and modern equipment to international standards, with special attention given to high-level experts, engineers, and skilled workers.<\/p>\n<p class=\"\" data-start=\"6741\" data-end=\"6984\">Chairman An particularly stressed and reminded the corporation, \u201cAchieving this will enable EEMC to make a practical contribution to the implementation of the Party and State\u2019s policy to build an independent, self-reliant, and strong economy.\u201d<\/p>\n<p>Expressing his gratitude for the guidance and support from the Ministry of Industry and Trade and the Vietnam Electricity Group, Mr. Nguyen Trong Tieu \u2013 Vice Chairman of the Board of Directors of EEMC \u2013 modestly shared that this is just the initial success for EEMC. The corporation will continue its research to bring higher-quality industrial products to the market. He also expressed deep emotion and gratitude to the dedicated teams of design engineers, technologists, and skilled workers at EEMC who have worked tirelessly to achieve this proud outcome.<\/p>\n<figure id=\"attachment_14355\" aria-describedby=\"caption-attachment-14355\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture5.png\"><img decoding=\"async\" class=\"wp-image-14355 size-medium\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture5-600x400.png\" alt=\"\" width=\"600\" height=\"400\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture5-600x400.png 600w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture5.png 624w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-14355\" class=\"wp-caption-text\">Mr. Nguyen Trong Tieu \u2013 Vice Chairman of the Board of Directors of EEMC expressed his gratitude to the ministries, sectors, and EVN.<\/figcaption><\/figure>\n<p>Completing the project is a meaningful gift that the leadership and staff of EEMC present in gratitude to the Vietnamese Electricity Industry on the occasion of the 70th Anniversary of its Traditional Day, affirming EEMC\u2019s pioneering and innovative spirit in the field of electrical mechanical engineering.<\/p>\n<p>On this occasion, many teams and individuals of Dong Anh Electrical Equipment Corporation were honored by the Vietnam Electricity Group and the Vietnam Electricity Trade Union<\/p>\n<figure id=\"attachment_14359\" aria-describedby=\"caption-attachment-14359\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture7.png\"><img decoding=\"async\" class=\"wp-image-14359 size-medium\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture7-600x400.png\" alt=\"\" width=\"600\" height=\"400\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture7-600x400.png 600w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture7.png 624w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-14359\" class=\"wp-caption-text\">Mr. Dang Hoang An \u2013 Chairman of the Board of Members of EVN, presented awards from EVN to outstanding teams in the design and manufacturing of the 500 kV \u2013 3\u00d7300 MVA transformer.<\/figcaption><\/figure>\n<figure id=\"attachment_14363\" aria-describedby=\"caption-attachment-14363\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture8.png\"><img decoding=\"async\" class=\"wp-image-14363 size-medium\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture8-600x400.png\" alt=\"\" width=\"600\" height=\"400\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture8-600x400.png 600w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture8.png 624w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-14363\" class=\"wp-caption-text\">Mr. Nguyen Anh Tuan \u2013 General Director of EVN, presented awards from EVN to outstanding individuals in the design and manufacturing of the 500 kV \u2013 3\u00d7300 MVA transformer.<\/figcaption><\/figure>\n<figure id=\"attachment_14365\" aria-describedby=\"caption-attachment-14365\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture9.png\"><img decoding=\"async\" class=\"wp-image-14365 size-medium\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture9-600x400.png\" alt=\"\" width=\"600\" height=\"400\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture9-600x400.png 600w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/Picture9.png 624w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><figcaption id=\"caption-attachment-14365\" class=\"wp-caption-text\">Mr. Do Duc Hung \u2013 Chairman of the Vietnam Electricity Trade Union, presented awards from the Vietnam Electricity Trade Union to exemplary individuals in the project implementation.<\/figcaption><\/figure>\n<p class=\"\" data-start=\"8570\" data-end=\"8980\">The success of this project will serve as an important foundation for EEMC to continue researching and manufacturing new products such as current transformers, voltage transformers, 500 kV reactors, clean gas-insulated switchgear (GIS) substations, etc., helping to increase the localization rate of equipment in Vietnam\u2019s power grid and contributing to national energy security for socio-economic development.<\/p>\n<p class=\"\" data-start=\"8982\" data-end=\"9026\">EEMC \u2013 Transmitting energy, inspiring trust.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On December 16, 2024, Dong Anh Electrical Equipment Corporation (EEMC) successfully held the Factory Dispatch Ceremony and Installed the Project Signboard \u201cDesign and Manufacturing of 500 kV \u2013 3\u00d7300 MVA Transformers\u201d to celebrate the 70th [&#8230;]\n","protected":false},"author":1,"featured_media":14348,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"aside","meta":{"footnotes":""},"categories":[1651,1659],"tags":[1776,1777,1778],"class_list":["post-15884","post","type-post","status-publish","format-aside","has-post-thumbnail","hentry","category-eemc-news","category-news-en","tag-300mva-en","tag-500kv-en","tag-500kv-300mva-en","post_format-post-format-aside"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Factory Release and Signboard Ceremony for the &quot;Design and Manufacture of 500 kV - 3\u00d7300 MVA Transformers&quot; Project. - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eemc.com.vn\/en\/14346.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Factory Release and Signboard Ceremony for the &quot;Design and Manufacture of 500 kV - 3\u00d7300 MVA Transformers&quot; Project. - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\" \/>\n<meta property=\"og:description\" content=\"On December 16, 2024, Dong Anh Electrical Equipment Corporation (EEMC) successfully held the Factory Dispatch Ceremony and Installed the Project Signboard \u201cDesign and Manufacturing of 500 kV \u2013 3\u00d7300 MVA Transformers\u201d to celebrate the 70th [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eemc.com.vn\/en\/14346.html\" \/>\n<meta property=\"og:site_name\" content=\"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-24T08:27:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-24T02:15:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html#article\",\"isPartOf\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af\"},\"headline\":\"Factory Release and Signboard Ceremony for the &#8220;Design and Manufacture of 500 kV &#8211; 3\u00d7300 MVA Transformers&#8221; Project.\",\"datePublished\":\"2025-02-24T08:27:51+00:00\",\"dateModified\":\"2025-03-24T02:15:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html\"},\"wordCount\":1422,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/eemc.com.vn\/en#organization\"},\"image\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg\",\"keywords\":[\"300mva\",\"500kv\",\"500kv-300mva\"],\"articleSection\":[\"EEMC News\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/eemc.com.vn\/en\/14346.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html\",\"url\":\"https:\/\/eemc.com.vn\/en\/14346.html\",\"name\":\"Factory Release and Signboard Ceremony for the \\\"Design and Manufacture of 500 kV - 3\u00d7300 MVA Transformers\\\" Project. - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\",\"isPartOf\":{\"@id\":\"https:\/\/eemc.com.vn\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html#primaryimage\"},\"image\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg\",\"datePublished\":\"2025-02-24T08:27:51+00:00\",\"dateModified\":\"2025-03-24T02:15:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eemc.com.vn\/en\/14346.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html#primaryimage\",\"url\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg\",\"contentUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eemc.com.vn\/en\/14346.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"HomeTrang ch\u1ee7\",\"item\":\"https:\/\/eemc.com.vn\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tin t\u1ee9c\",\"item\":\"https:\/\/eemc.com.vn\/en\/category\/tin-tuc-en\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Factory Release and Signboard Ceremony for the &#8220;Design and Manufacture of 500 kV &#8211; 3\u00d7300 MVA Transformers&#8221; Project.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eemc.com.vn\/en#website\",\"url\":\"https:\/\/eemc.com.vn\/en\",\"name\":\"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\",\"description\":\"m\u00e1y bi\u1ebfn \u00e1p \u0110\u00f4ng Anh\",\"publisher\":{\"@id\":\"https:\/\/eemc.com.vn\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eemc.com.vn\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/eemc.com.vn\/en#organization\",\"name\":\"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh\",\"alternateName\":\"EEMC\",\"url\":\"https:\/\/eemc.com.vn\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/\",\"url\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg\",\"contentUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg\",\"width\":2560,\"height\":1037,\"caption\":\"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh\"},\"image\":{\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"url\":\"https:\/\/eemc.com.vn\/en\/author\/admin\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Factory Release and Signboard Ceremony for the \"Design and Manufacture of 500 kV - 3\u00d7300 MVA Transformers\" Project. - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eemc.com.vn\/en\/14346.html","og_locale":"en_US","og_type":"article","og_title":"Factory Release and Signboard Ceremony for the \"Design and Manufacture of 500 kV - 3\u00d7300 MVA Transformers\" Project. - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","og_description":"On December 16, 2024, Dong Anh Electrical Equipment Corporation (EEMC) successfully held the Factory Dispatch Ceremony and Installed the Project Signboard \u201cDesign and Manufacturing of 500 kV \u2013 3\u00d7300 MVA Transformers\u201d to celebrate the 70th [...]","og_url":"https:\/\/eemc.com.vn\/en\/14346.html","og_site_name":"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","article_published_time":"2025-02-24T08:27:51+00:00","article_modified_time":"2025-03-24T02:15:49+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eemc.com.vn\/en\/14346.html#article","isPartOf":{"@id":"https:\/\/eemc.com.vn\/en\/14346.html"},"author":{"name":"admin","@id":"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af"},"headline":"Factory Release and Signboard Ceremony for the &#8220;Design and Manufacture of 500 kV &#8211; 3\u00d7300 MVA Transformers&#8221; Project.","datePublished":"2025-02-24T08:27:51+00:00","dateModified":"2025-03-24T02:15:49+00:00","mainEntityOfPage":{"@id":"https:\/\/eemc.com.vn\/en\/14346.html"},"wordCount":1422,"commentCount":0,"publisher":{"@id":"https:\/\/eemc.com.vn\/en#organization"},"image":{"@id":"https:\/\/eemc.com.vn\/en\/14346.html#primaryimage"},"thumbnailUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg","keywords":["300mva","500kv","500kv-300mva"],"articleSection":["EEMC News","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/eemc.com.vn\/en\/14346.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/eemc.com.vn\/en\/14346.html","url":"https:\/\/eemc.com.vn\/en\/14346.html","name":"Factory Release and Signboard Ceremony for the \"Design and Manufacture of 500 kV - 3\u00d7300 MVA Transformers\" Project. - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","isPartOf":{"@id":"https:\/\/eemc.com.vn\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/eemc.com.vn\/en\/14346.html#primaryimage"},"image":{"@id":"https:\/\/eemc.com.vn\/en\/14346.html#primaryimage"},"thumbnailUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg","datePublished":"2025-02-24T08:27:51+00:00","dateModified":"2025-03-24T02:15:49+00:00","breadcrumb":{"@id":"https:\/\/eemc.com.vn\/en\/14346.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eemc.com.vn\/en\/14346.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eemc.com.vn\/en\/14346.html#primaryimage","url":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg","contentUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/02\/1.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/eemc.com.vn\/en\/14346.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"HomeTrang ch\u1ee7","item":"https:\/\/eemc.com.vn\/en"},{"@type":"ListItem","position":2,"name":"Tin t\u1ee9c","item":"https:\/\/eemc.com.vn\/en\/category\/tin-tuc-en"},{"@type":"ListItem","position":3,"name":"Factory Release and Signboard Ceremony for the &#8220;Design and Manufacture of 500 kV &#8211; 3\u00d7300 MVA Transformers&#8221; Project."}]},{"@type":"WebSite","@id":"https:\/\/eemc.com.vn\/en#website","url":"https:\/\/eemc.com.vn\/en","name":"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","description":"m\u00e1y bi\u1ebfn \u00e1p \u0110\u00f4ng Anh","publisher":{"@id":"https:\/\/eemc.com.vn\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eemc.com.vn\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eemc.com.vn\/en#organization","name":"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh","alternateName":"EEMC","url":"https:\/\/eemc.com.vn\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/","url":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg","contentUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg","width":2560,"height":1037,"caption":"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh"},"image":{"@id":"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eemc.com.vn\/en#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g","caption":"admin"},"url":"https:\/\/eemc.com.vn\/en\/author\/admin"}]}},"_links":{"self":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts\/15884","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/comments?post=15884"}],"version-history":[{"count":3,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts\/15884\/revisions"}],"predecessor-version":[{"id":16109,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts\/15884\/revisions\/16109"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/media\/14348"}],"wp:attachment":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/media?parent=15884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/categories?post=15884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/tags?post=15884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}