{"id":18220,"date":"2025-11-10T15:53:34","date_gmt":"2025-11-10T08:53:34","guid":{"rendered":"https:\/\/eemc.com.vn\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html"},"modified":"2025-11-24T09:03:31","modified_gmt":"2025-11-24T02:03:31","slug":"eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc","status":"publish","type":"post","link":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html","title":{"rendered":"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects"},"content":{"rendered":"<p>In October 2025 and early November 2025, <strong>Dong Anh Electrical Equipment Corporation \u2013 JSC (EEMC)<\/strong> successfully completed the manufacturing, supply, and commissioning of a series of 110\u2013220 kV power transformers for key projects of EVNNPT and EVNNPC. All projects were put into operation on schedule or ahead of plan, contributing to stable power supply, load reduction in critical areas, improved grid reliability, and enhanced operational efficiency of Vietnam\u2019s power sector.<\/p>\n<figure id=\"attachment_17787\" aria-describedby=\"caption-attachment-17787\" style=\"width: 990px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg\"><img decoding=\"async\" class=\"wp-image-17787 size-full\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg\" alt=\"\" width=\"990\" height=\"586\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg 990w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2-676x400.jpg 676w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2-768x455.jpg 768w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2-600x355.jpg 600w\" sizes=\"(max-width: 990px) 100vw, 990px\" \/><\/a><figcaption id=\"caption-attachment-17787\" class=\"wp-caption-text\">220 kV \u2013 250 MVA Power Transformer at Phu Tho 2 Substation<\/figcaption><\/figure>\n<p><strong>A number of key projects featuring EEMC-supplied power transformers have been completed on schedule, including:<\/strong><\/p>\n<ul>\n<li><strong>Gia L\u1ed9c 220 kV Substation:<\/strong> Equipped with two 220 kV \u2013 250 MVA transformers, energized on 23\/10\/2025, ensuring reliable power supply for the Hai Duong \u2013 Hai Phong area (now Hai Phong City).<\/li>\n<li><strong>110 kV Substation connected to Gia L\u1ed9c 220 kV:<\/strong> A 110\/35\/22 kV \u2013 63 MVA transformer manufactured by EEMC, energized on 25\/10\/2025, meeting the rapidly increasing industrial load demand.<\/li>\n<li><strong>Phu Tho 2 \u2013 220 kV Substation:<\/strong> A 220 kV \u2013 250 MVA transformer energized on 03\/11\/2025, enhancing transmission capability and supporting the socio-economic development of Phu Tho Province.<\/li>\n<li><strong>Bac Quang \u2013 220 kV Substation:<\/strong> A 220 kV \u2013 250 MVA transformer energized on 27\/10\/2025, enabling efficient power evacuation from hydropower plants during the rainy season.<\/li>\n<li><strong>Muong Te (Lai Chau) \u2013 220 kV Substation, Phase 3:<\/strong> EEMC supplied the third 220 kV \u2013 250 MVA transformer, energized on 29\/10\/2025, completing the substation with a total capacity of 750 MVA and strengthening power evacuation from Northwest hydropower sources while improving national grid stability.<\/li>\n<li><strong>Chau Son \u2013 110 kV Substation (Ninh Binh):<\/strong> A 110\/35\/22 kV \u2013 63 MVA transformer supplied by EEMC, energized on 02\/11\/2025, ensuring stable electricity supply for Chau Son Industrial Park and nearby areas.<\/li>\n<li><strong>Duong Kinh \u2013 220 kV Substation (Hai Phong):<\/strong> A 63 MVA \u2013 115\/23(11) kV transformer supplied by EEMC, energized on 08\/11\/2025, ensuring stable power for local loads and reducing burden on existing 220 kV transformers in Hai Phong City.<\/li>\n<\/ul>\n<p>The continuous completion and successful energization of multiple major projects within a short period has affirmed EEMC\u2019s strong manufacturing capability, professionalism, and brand reputation. It also highlights the close and effective cooperation between EEMC and project owners in ensuring the highest standards of progress, quality, and safety throughout project implementation.<\/p>\n<p>Some images of EEMC power transformers being installed and operating at project sites:<\/p>\n<figure id=\"attachment_17785\" aria-describedby=\"caption-attachment-17785\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><a style=\"font-size: 14.4px;\" href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/1.jpg\"><img decoding=\"async\" class=\"wp-image-17785 size-full\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/1.jpg\" alt=\"\" width=\"1100\" height=\"726\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/1.jpg 1100w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/1-606x400.jpg 606w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/1-768x507.jpg 768w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/1-600x396.jpg 600w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><\/a><figcaption id=\"caption-attachment-17785\" class=\"wp-caption-text\">AT1 220 kV \u2013 250 MVA transformer at Gia Loc 220 kV Substation (Hai Phong)<\/figcaption><\/figure>\n<p><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/3.jpg\"><img decoding=\"async\" class=\"wp-image-17789 size-full aligncenter\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/3.jpg\" alt=\"\" width=\"1126\" height=\"662\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/3.jpg 1126w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/3-680x400.jpg 680w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/3-768x452.jpg 768w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/3-600x353.jpg 600w\" sizes=\"(max-width: 1126px) 100vw, 1126px\" \/><\/a><\/p>\n<div class=\"mceTemp\">\n<p>M\u00e1y bi\u1ebfn \u00e1p AT2 220 kV-250 MVA Tr\u1ea1m bi\u1ebfn \u00e1p 220 kV B\u1eafc Quang (Tuy\u00ean Quang)<\/p>\n<figure id=\"attachment_17791\" aria-describedby=\"caption-attachment-17791\" style=\"width: 1000px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/4.jpg\"><img decoding=\"async\" class=\"wp-image-17791 size-full\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/4.jpg\" alt=\"\" width=\"1000\" height=\"655\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/4.jpg 1000w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/4-611x400.jpg 611w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/4-768x503.jpg 768w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/4-600x393.jpg 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/a><figcaption id=\"caption-attachment-17791\" class=\"wp-caption-text\">\u00a0AT3 220 kV \u2013 250 MVA transformer at Muong Te 220 kV Substation (Lai Chau)<\/figcaption><\/figure>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>In October 2025 and early November 2025, Dong Anh Electrical Equipment Corporation \u2013 JSC (EEMC) successfully completed the manufacturing, supply, and commissioning of a series of 110\u2013220 kV power transformers for key projects of EVNNPT [&#8230;]\n","protected":false},"author":1,"featured_media":17788,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"aside","meta":{"footnotes":""},"categories":[1659,1651],"tags":[],"class_list":["post-18220","post","type-post","status-publish","format-aside","has-post-thumbnail","hentry","category-news-en","category-eemc-news","post_format-post-format-aside"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\" \/>\n<meta property=\"og:description\" content=\"In October 2025 and early November 2025, Dong Anh Electrical Equipment Corporation \u2013 JSC (EEMC) successfully completed the manufacturing, supply, and commissioning of a series of 110\u2013220 kV power transformers for key projects of EVNNPT [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html\" \/>\n<meta property=\"og:site_name\" content=\"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-10T08:53:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-24T02:03:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"990\" \/>\n\t<meta property=\"og:image:height\" content=\"586\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#article\",\"isPartOf\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af\"},\"headline\":\"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects\",\"datePublished\":\"2025-11-10T08:53:34+00:00\",\"dateModified\":\"2025-11-24T02:03:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html\"},\"wordCount\":423,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/eemc.com.vn\/en#organization\"},\"image\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg\",\"articleSection\":[\"News\",\"EEMC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html\",\"url\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html\",\"name\":\"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\",\"isPartOf\":{\"@id\":\"https:\/\/eemc.com.vn\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#primaryimage\"},\"image\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg\",\"datePublished\":\"2025-11-10T08:53:34+00:00\",\"dateModified\":\"2025-11-24T02:03:31+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#primaryimage\",\"url\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg\",\"contentUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg\",\"width\":990,\"height\":586},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"HomeTrang ch\u1ee7\",\"item\":\"https:\/\/eemc.com.vn\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"EEMC News\",\"item\":\"https:\/\/eemc.com.vn\/en\/category\/eemc-news\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eemc.com.vn\/en#website\",\"url\":\"https:\/\/eemc.com.vn\/en\",\"name\":\"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\",\"description\":\"m\u00e1y bi\u1ebfn \u00e1p \u0110\u00f4ng Anh\",\"publisher\":{\"@id\":\"https:\/\/eemc.com.vn\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eemc.com.vn\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/eemc.com.vn\/en#organization\",\"name\":\"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh\",\"alternateName\":\"EEMC\",\"url\":\"https:\/\/eemc.com.vn\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/\",\"url\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg\",\"contentUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg\",\"width\":2560,\"height\":1037,\"caption\":\"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh\"},\"image\":{\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"url\":\"https:\/\/eemc.com.vn\/en\/author\/admin\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html","og_locale":"en_US","og_type":"article","og_title":"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","og_description":"In October 2025 and early November 2025, Dong Anh Electrical Equipment Corporation \u2013 JSC (EEMC) successfully completed the manufacturing, supply, and commissioning of a series of 110\u2013220 kV power transformers for key projects of EVNNPT [...]","og_url":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html","og_site_name":"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","article_published_time":"2025-11-10T08:53:34+00:00","article_modified_time":"2025-11-24T02:03:31+00:00","og_image":[{"width":990,"height":586,"url":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#article","isPartOf":{"@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html"},"author":{"name":"admin","@id":"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af"},"headline":"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects","datePublished":"2025-11-10T08:53:34+00:00","dateModified":"2025-11-24T02:03:31+00:00","mainEntityOfPage":{"@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html"},"wordCount":423,"commentCount":0,"publisher":{"@id":"https:\/\/eemc.com.vn\/en#organization"},"image":{"@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#primaryimage"},"thumbnailUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg","articleSection":["News","EEMC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html","url":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html","name":"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","isPartOf":{"@id":"https:\/\/eemc.com.vn\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#primaryimage"},"image":{"@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#primaryimage"},"thumbnailUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg","datePublished":"2025-11-10T08:53:34+00:00","dateModified":"2025-11-24T02:03:31+00:00","breadcrumb":{"@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#primaryimage","url":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg","contentUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/11\/2.jpg","width":990,"height":586},{"@type":"BreadcrumbList","@id":"https:\/\/eemc.com.vn\/en\/eemc-dong-dien-nhieu-may-bien-ap-110-220-kv-dam-bao-tien-do-cac-du-an-cua-evnnpt-va-evnnpc.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"HomeTrang ch\u1ee7","item":"https:\/\/eemc.com.vn\/en"},{"@type":"ListItem","position":2,"name":"EEMC News","item":"https:\/\/eemc.com.vn\/en\/category\/eemc-news"},{"@type":"ListItem","position":3,"name":"EEMC Energizes Multiple 110\u2013220 kV Power Transformers, Ensuring the Progress of EVNNPT and EVNNPC Projects"}]},{"@type":"WebSite","@id":"https:\/\/eemc.com.vn\/en#website","url":"https:\/\/eemc.com.vn\/en","name":"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","description":"m\u00e1y bi\u1ebfn \u00e1p \u0110\u00f4ng Anh","publisher":{"@id":"https:\/\/eemc.com.vn\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eemc.com.vn\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eemc.com.vn\/en#organization","name":"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh","alternateName":"EEMC","url":"https:\/\/eemc.com.vn\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/","url":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg","contentUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg","width":2560,"height":1037,"caption":"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh"},"image":{"@id":"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eemc.com.vn\/en#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g","caption":"admin"},"url":"https:\/\/eemc.com.vn\/en\/author\/admin"}]}},"_links":{"self":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts\/18220","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/comments?post=18220"}],"version-history":[{"count":2,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts\/18220\/revisions"}],"predecessor-version":[{"id":18222,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts\/18220\/revisions\/18222"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/media\/17788"}],"wp:attachment":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/media?parent=18220"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/categories?post=18220"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/tags?post=18220"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}