{"id":19997,"date":"2025-12-15T10:47:53","date_gmt":"2025-12-15T03:47:53","guid":{"rendered":"https:\/\/eemc.com.vn\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html"},"modified":"2026-03-24T12:28:27","modified_gmt":"2026-03-24T05:28:27","slug":"dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh","status":"publish","type":"post","link":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html","title":{"rendered":"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation"},"content":{"rendered":"<p style=\"text-align: justify;\">At 22:45 on December 14, 2025, the National Power Transmission Corporation (EVNNPT) and Dong Anh Electrical Equipment Corporation (EEMC) successfully energized the 500 kV \u2013 3\u00d7300 MVA transformer unit at the Hoa Binh 500 kV substation in Phu Tho Province.<\/p>\n<figure id=\"attachment_19397\" aria-describedby=\"caption-attachment-19397\" style=\"width: 1506px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg\"><img decoding=\"async\" class=\"wp-image-19397 size-full\" src=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg\" alt=\"\" width=\"1506\" height=\"1004\" srcset=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg 1506w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4-600x400.jpg 600w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4-1200x800.jpg 1200w, https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4-768x512.jpg 768w\" sizes=\"(max-width: 1506px) 100vw, 1506px\" \/><\/a><figcaption id=\"caption-attachment-19397\" class=\"wp-caption-text\">EEMC-manufactured 500 kV \u2013 3\u00d7300 MVA transformer unit in operation<\/figcaption><\/figure>\n<p style=\"text-align: justify;\">The 500 kV \u2013 3\u00d7300 MVA transformer unit, designed and manufactured by EEMC, is a product of a national-level science and technology project assigned by the Ministry of Science and Technology. After being rated \u201cExcellent\u201d by the State Acceptance Council and approved by Vietnam Electricity (EVN) for operation, EEMC carried out transportation and installation at position AT2 of the Hoa Binh 500 kV substation. Under the direction of EVNNPT and with close coordination among relevant parties, the transformer unit completed installation, testing, and commissioning on December 8, 2025.<\/p>\n<p style=\"text-align: justify;\">Upon commissioning, the capacity of the Hoa Binh 500 kV substation increased from 900 MVA to 1,350 MVA. This enhancement significantly strengthens transmission capacity, facilitates power evacuation from hydropower plants in the Northwest region, and ensures a stable electricity supply for Hanoi.<\/p>\n<p>Building on this success, EEMC will continue to manufacture and supply 500 kV transformers, working together with EVN to ensure sufficient power supply for the country\u2019s socio-economic development, in line with Politburo Resolutions No. 57 and No. 70.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>At 22:45 on December 14, 2025, the National Power Transmission Corporation (EVNNPT) and Dong Anh Electrical Equipment Corporation (EEMC) successfully energized the 500 kV \u2013 3\u00d7300 MVA transformer unit at the Hoa Binh 500 kV [&#8230;]\n","protected":false},"author":1,"featured_media":19398,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"aside","meta":{"footnotes":""},"categories":[1651,1815],"tags":[],"class_list":["post-19997","post","type-post","status-publish","format-aside","has-post-thumbnail","hentry","category-eemc-news","category-tin-tuc-en","post_format-post-format-aside"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\" \/>\n<meta property=\"og:description\" content=\"At 22:45 on December 14, 2025, the National Power Transmission Corporation (EVNNPT) and Dong Anh Electrical Equipment Corporation (EEMC) successfully energized the 500 kV \u2013 3\u00d7300 MVA transformer unit at the Hoa Binh 500 kV [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html\" \/>\n<meta property=\"og:site_name\" content=\"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-15T03:47:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-24T05:28:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1506\" \/>\n\t<meta property=\"og:image:height\" content=\"1004\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#article\",\"isPartOf\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af\"},\"headline\":\"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation\",\"datePublished\":\"2025-12-15T03:47:53+00:00\",\"dateModified\":\"2026-03-24T05:28:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html\"},\"wordCount\":226,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/eemc.com.vn\/en#organization\"},\"image\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg\",\"articleSection\":[\"EEMC News\",\"Tin t\u1ee9c\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html\",\"url\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html\",\"name\":\"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\",\"isPartOf\":{\"@id\":\"https:\/\/eemc.com.vn\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#primaryimage\"},\"image\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg\",\"datePublished\":\"2025-12-15T03:47:53+00:00\",\"dateModified\":\"2026-03-24T05:28:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#primaryimage\",\"url\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg\",\"contentUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg\",\"width\":1506,\"height\":1004},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"HomeTrang ch\u1ee7\",\"item\":\"https:\/\/eemc.com.vn\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tin t\u1ee9c\",\"item\":\"https:\/\/eemc.com.vn\/en\/category\/tin-tuc-en\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eemc.com.vn\/en#website\",\"url\":\"https:\/\/eemc.com.vn\/en\",\"name\":\"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh\",\"description\":\"m\u00e1y bi\u1ebfn \u00e1p \u0110\u00f4ng Anh\",\"publisher\":{\"@id\":\"https:\/\/eemc.com.vn\/en#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eemc.com.vn\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/eemc.com.vn\/en#organization\",\"name\":\"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh\",\"alternateName\":\"EEMC\",\"url\":\"https:\/\/eemc.com.vn\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/\",\"url\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg\",\"contentUrl\":\"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg\",\"width\":2560,\"height\":1037,\"caption\":\"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh\"},\"image\":{\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eemc.com.vn\/en#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"url\":\"https:\/\/eemc.com.vn\/en\/author\/admin\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html","og_locale":"en_US","og_type":"article","og_title":"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","og_description":"At 22:45 on December 14, 2025, the National Power Transmission Corporation (EVNNPT) and Dong Anh Electrical Equipment Corporation (EEMC) successfully energized the 500 kV \u2013 3\u00d7300 MVA transformer unit at the Hoa Binh 500 kV [...]","og_url":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html","og_site_name":"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","article_published_time":"2025-12-15T03:47:53+00:00","article_modified_time":"2026-03-24T05:28:27+00:00","og_image":[{"width":1506,"height":1004,"url":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#article","isPartOf":{"@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html"},"author":{"name":"admin","@id":"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af"},"headline":"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation","datePublished":"2025-12-15T03:47:53+00:00","dateModified":"2026-03-24T05:28:27+00:00","mainEntityOfPage":{"@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html"},"wordCount":226,"commentCount":0,"publisher":{"@id":"https:\/\/eemc.com.vn\/en#organization"},"image":{"@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#primaryimage"},"thumbnailUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg","articleSection":["EEMC News","Tin t\u1ee9c"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html","url":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html","name":"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation - T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","isPartOf":{"@id":"https:\/\/eemc.com.vn\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#primaryimage"},"image":{"@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#primaryimage"},"thumbnailUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg","datePublished":"2025-12-15T03:47:53+00:00","dateModified":"2026-03-24T05:28:27+00:00","breadcrumb":{"@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#primaryimage","url":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg","contentUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/12\/1-4.jpg","width":1506,"height":1004},{"@type":"BreadcrumbList","@id":"https:\/\/eemc.com.vn\/en\/dong-dien-thanh-cong-san-pham-khoa-hoc-cong-nghe-cap-quoc-gia-may-bien-ap-500-kv-900-mva-make-in-vietnam-dau-tien-tai-tram-500-kv-hoa-binh.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"HomeTrang ch\u1ee7","item":"https:\/\/eemc.com.vn\/en"},{"@type":"ListItem","position":2,"name":"Tin t\u1ee9c","item":"https:\/\/eemc.com.vn\/en\/category\/tin-tuc-en"},{"@type":"ListItem","position":3,"name":"Successful energization of Vietnam\u2019s first \u201cMake in Vietnam\u201d 500 kV \u2013 3\u00d7300 MVA national-level scientific and technological transformer at the Hoa Binh 500 kV substation"}]},{"@type":"WebSite","@id":"https:\/\/eemc.com.vn\/en#website","url":"https:\/\/eemc.com.vn\/en","name":"T\u1ed5ng c\u00f4ng ty Thi\u1ebft B\u1ecb \u0110i\u1ec7n \u0110\u00f4ng Anh","description":"m\u00e1y bi\u1ebfn \u00e1p \u0110\u00f4ng Anh","publisher":{"@id":"https:\/\/eemc.com.vn\/en#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eemc.com.vn\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eemc.com.vn\/en#organization","name":"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh","alternateName":"EEMC","url":"https:\/\/eemc.com.vn\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/","url":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg","contentUrl":"https:\/\/eemc.com.vn\/wp-content\/uploads\/2025\/03\/logo-EEMC-2025-ng-TV-scaled.jpg","width":2560,"height":1037,"caption":"T\u1ed5ng c\u00f4ng ty thi\u1ebft b\u1ecb \u0111i\u1ec7n \u0110\u00f4ng Anh"},"image":{"@id":"https:\/\/eemc.com.vn\/en#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/eemc.com.vn\/en#\/schema\/person\/bfb2de07293f6714202ffbaa6252e0af","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eemc.com.vn\/en#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0371f61c815c05e0bb53fe48e16971d7?s=96&d=mm&r=g","caption":"admin"},"url":"https:\/\/eemc.com.vn\/en\/author\/admin"}]}},"_links":{"self":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts\/19997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/comments?post=19997"}],"version-history":[{"count":1,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts\/19997\/revisions"}],"predecessor-version":[{"id":19998,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/posts\/19997\/revisions\/19998"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/media\/19398"}],"wp:attachment":[{"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/media?parent=19997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/categories?post=19997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eemc.com.vn\/en\/wp-json\/wp\/v2\/tags?post=19997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}